Engineered to Fail? Warnings in 2002 Report to City of Hattiesburg’s Engineer Predicted Odors and Lagoon Overload

0
9

A 2002 study of the City of Hattiesburg’s waste-water by In Pipe technologies predicted the odor and catastrophic overload of the city’s waste-water lagoon system. . Under the Dupree Appointee Bennie Seller’s management the lagoon system deteriorated substantially.  In 2007 a capital replacement plan by United Water addressed to Mr. Sellers and Mayor Dupree was […]

Read More at Hattiesburg Patriot